Features of Beit Al Watan Fifth Settlement:

  • Its distinguished location in the Fifth Settlement.
  • Secondly, the Beit Al Watan area is close to the New Administrative Capital.
  • Moderate population density, which leads to more tranquility and distinction.
  • Building requirements to be more like villas, as the project consists of a ground floor and 3 recurring floors.
  • A distinctive view of the View Zone.
  • Near Beit Al Watan, Al Nawadi Street area.
  • Price per meter compared to other areas in the Fifth Settlement.
  • Moderate population density, which leads to more tranquility and distinction. Building requirements to be more like villas, as the project consists of a ground floor and 3 recurring floors. A distinctive view of the View Zone.
  • Near Beit Al Watan, Al Nawadi Street area. Price per meter compared to other areas in the Fifth Settlement.
  • The Fifth District, Beit Al Watan, is one of the most important neighborhoods due to its strategic location, as it is bordered to the east by the most famous and prestigious compounds in the Fifth Settlement, such as Palm Hills Compound, New Cairo, and to the west by the View Zone, the largest service area in New Cairo.
  • The Fifth District in Beit Al Watan is one of the first neighborhoods in which facilities were delivered.
  • Finally: The roads of the Fifth District were paved with asphalt.
  • Corner of a main street and a garden, 6500 m. 3 projects from the Fifth District services.
  • Two minutes away from the View Zone.
  • 5 minutes away from Al-Ahly Club.
  • The project areas start from 152 sqm to 231 sqm.
  • Receipt of 3 years (12/2025).

Features that are unique to AlMira

  • The project was built using insulated and energy-saving wall technology and roofs.
  • Solar cells for utility lighting.
  • Electric car charging stations in the garage.
  • Smart designs with realistic dimensions.
  • Earthquake-resistant residential buildings.
  • Preparing the Smart Home System path A contract that guarantees your rights with a clause not to increase the unit price in the event of an increase in building materials.
  •  A specific timetable for project construction developments is attached to the contract.